Moto racing for iPhone

Canyon Rush

A one-touch motorcycle time trial built around speed, timing, and the perfect racing line. Hold to accelerate. Release to brake.

One-touch controlHold for gas. Release to brake.
1.47-mile runLearn every corner and braking point.
Global leaderboardCompare your best time through Game Center.
Simple to learn

Every corner is a decision

The motorcycle follows the canyon road. Your job is to control speed: stay on the throttle too long and you crash; brake too early and the clock wins.

01 / GAS

Hold to accelerate

Build speed on straights and carry momentum into each section of the canyon.

02 / BRAKE

Release before the turn

Find the braking point that keeps the bike fast without pushing it beyond the road.

03 / REPEAT

Chase the perfect run

Improve your personal best and climb the global Game Center leaderboard.

Actual gameplay

One road. No shortcuts.

A clean, focused time trial where every fraction of a second matters.

Canyon Rush main menu showing Play, Leaderboard, best time, Remove Ads and Restore
Motorcycle approaching a tight canyon hairpin in Canyon Rush
Motorcycle riding through a sequence of canyon S-curves
Motorcycle taking a tight right-hand turn in Canyon Rush
How to play

One touch. One perfect line.

There are no steering buttons to learn. Canyon Rush turns the motorcycle along the road while you manage acceleration and braking.

  1. 1
    Press and holdAccelerate through the canyon.
  2. 2
    ReleaseBrake before the curve becomes too tight.
  3. 3
    RetryMemorize the road and beat your best time.
Canyon Rush motorcycle gameplay on a winding road

Need help?

Find purchase restoration, Game Center, gameplay and contact information.

Open support